BMA Blackwater Dragline 26 & Dragline 41 UDD Project

Power Electric Switchboards was awarded the contract to design and manufacture the following Motor Control Centres as part of the Universal Dig & Dump (UDD) upgrade project on Dragline 26 (Marion 8050) and Dragline 41 (Marion 8200) at BMA’s Blackwater mine:

  • Dragline 26
    • Power Control Room MCC
    • Essential Services MCC
    • Fan MCC
  • Dragline 41
    • Power Control Room MCC
    • Essential Services MCC
    • AC Distribution