Auckland Point Terminal Upgrade Project - Gladstone Port

In mid 2006 Power Electric Switchboards was awarded a contract by the Central Queensland Ports Authority as part of the Auckland Point Terminal Electrical Infrastructure Upgrade at Gladstone Port, upgrading switchboards for the bulk loading/unloading facilities for Magnesite and Calcite.

Power Electric Switchboards completed the design and manufacture of a Motor Control Centre, Metering Switchboard, and Transportable Switchroom Building for Central Queensland Ports Authority (CQPA) as part of the Auckland Point Terminal Electrical Infrastructure Upgrade at Gladstone Port.